Mission Atlas
← Mission directory

Mission record

Phobos 2

Also known as Fobos 2, 1F No.102, Phobos2

Institut Kosmicheskich Issledovaniy · Launched

Explore trajectory

Partial success · Partial success

One of two 1F spacecraft launched in July 1988, and the one that reached Mars. Phobos 2 operated nominally throughout its cruise and Mars orbital insertion phases, gathering data on the Sun, interplanetary medium, Mars, and Phobos. Shortly before the final phase of the mission, during which the spacecraft was to approach within 50 m of Phobos' surface and release two landers, one a mobile hopper, the other a stationary platform, contact with Phobos 2 was lost. The mission ended when the spacecraft signal failed to be successfully reacquired on 27 March 1989. The commission identified a halted onboard computing process and loss of attitude, but its underlying cause remained unresolved.

Destinations
Launch vehicle
Proton-K
Launch site
Tyuratam (Baikonur Cosmodrome), U.S.S.R
Countries
Soviet Union
Mission types
Orbiter, Lander

Chronology

Mission timeline

  1. Launch

    Launched on a Proton-K

    NSSDCA's launch/orbital information page gives the launch date and time as 1988-07-12T17:01:43Z on a Proton-K from Tyuratam (Baikonur Cosmodrome), U.S.S.R. The Phobos Project page prints both launch dates together: 07 July 1988 (Phobos 1) and 12 July 1988 (Phobos 2). Phobos 2's master catalog page prints Mass: 2600 kg where Phobos 1's prints Mass: 6220 kg, and the project page prints 2600 Kg (6220 Kg with orbital insertion hardware attached).

    Earth
  2. Orbit insertion

    Entered Mars orbit

    The later NASA chronology reports insertion at 12:55 UT into an initial 819 by 81214 km orbit at 1.5 degrees. This refines the former year-only event. The preserved historical navigation segment starts at 13:00; no earlier insertion states are invented.

    Mars
  3. Mission end

    Signal not reacquired before the approach to Phobos

    Shortly before the final phase of the mission, during which the spacecraft was to approach within 50 m of Phobos' surface and release two landers, one a mobile hopper, the other a stationary platform, contact with Phobos 2 was lost. The mission ended when the spacecraft signal failed to be successfully reacquired on 27 March 1989. The cause of the failure was determined to be a malfunction of the on-board computer. Both NSSDCA pages cited here print 27 March 1989, where the same two pages disagree by a year about Phobos 1. NASA distinguishes the missed 15:58 contact from weak RF at 17:51–18:03 without telemetry, then formal program termination on April 14. The existing navigation cutoff before March 27 remains unchanged; the later radio detections and formal end do not establish further measured positions. RGANTD quotes the 1989 commission: the computing process stopped and orientation was lost, but the underlying cause could not be uniquely established.

    Mars
  4. Milestone

    Program formally terminated

    The NASA chronology dates formal termination to April 14 after March 27 loss of useful contact. This administrative date does not extend the published orbit or imply a lander deployment.

    Mars
  5. Deployment

    Main propulsion module jettisoned; date unresolved

    The NASA chronology reports jettison of the Fregat propulsion module following orbital corrections. No exact release date or separate stage state is supplied. The four hydrazine tanks retained on the orbital bus are distinct from the released main propulsion module.

    Mars

Mission architecture

Vehicles

  • Phobos 2 · Spacecraft

    Destinations: Mars

    • DAS (Dolgozhivushchaya AS) · Lander

    • PROP-FP hopper · Lander

    • Phobos 2 main propulsion module · Other

      Destinations: Mars

Trajectory record

Time-dependent navigation trajectory

Source states place the model at the selected time. Reconstructed flight, estimates, predictions and historical mission plans are identified by interval; gaps remain visible.

Source records and sampling assumptions are retained with the repository data. Model attitude and surface appearance are illustrative.

  • Phobos 2: Estimated · January 29, 1989 to March 26, 1989

Provenance

Sources

Each source is listed once and labeled with the mission, event, trajectory, or destination/body context it supports.

Data verified through September 14, 2026