Mission Atlas
← Mission directory

Mission record

Ranger 5

Also known as 1962 Beta Eta 1, Ranger5

NASA · Launched

Explore trajectory

Failed · Failure

Ranger 5 was a Block II Ranger similar to Rangers 3 and 4, intended to photograph the Moon during descent and deliver a seismometer capsule to the surface. An unknown malfunction after injection left the spacecraft without power, its batteries ran down after 8 hours and 44 minutes, and it missed the Moon by 725 km.

Destinations
Launch vehicle
Atlas-Agena B
Launch site
Cape Canaveral, United States
Countries
United States
Mission types
Impactor, Lander

Chronology

Mission timeline

  1. Launch

    Ranger 5 launched

    Earth
  2. Milestone

    Ground stations sent midcourse maneuver commands

    JPL records SC-1, SC-2 and SC-3 command sequences beginning at 23:50 GMT on October 18 and repeated at 01:03–01:07 GMT on October 19. The command record documents an attempted sequence, not a completed spacecraft velocity change; JPL reports battery exhaustion before the maneuver was complete.

    Earth
  3. Milestone

    Battery power was reported exhausted at approximately 01:45 GMT; intermittent solar-powered transponder tracking continued as the spacecraft tumbled

    Earth
  4. Flyby

    Ranger 5 missed the Moon by 725 km

    Moon

Mission architecture

Vehicles

  • Ranger 5 · Spacecraft

    Destinations: Moon

Trajectory record

Time-dependent navigation trajectory

Source states place the model at the selected time. Reconstructed flight, estimates, predictions and historical mission plans are identified by interval; gaps remain visible.

Source records and sampling assumptions are retained with the repository data. Model attitude and surface appearance are illustrative.

  • Ranger 5: Separated tracking-solution intervals, including post-rectification output through March 1963 · October 18, 1962 to March 21, 1963

Provenance

Sources

Each source is listed once and labeled with the mission, event, trajectory, or destination/body context it supports.

Data verified through October 6, 2026