Active · Active
NASA robotic lunar polar orbiter launched on 18 June 2009 that maps the Moon's surface topography, temperature, composition and radiation environment, with emphasis on the polar regions and on identifying safe landing sites and resources such as water ice. Still operating in 2026, it is described by NASA as the longest-lived lunar orbiting mission ever.
- Destinations
- Launch vehicle
- Atlas V 401
- Launch site
- Space Launch Complex 41, Cape Canaveral Air Force Station, Florida
- Countries
- United States
- Mission types
- Orbiter
Chronology
Mission timeline
Launch
Launch from Cape Canaveral on an Atlas V 401
LRO launched along with its companion spacecraft, the Lunar Crater Observation and Sensing Satellite (LCROSS), at 21:32 UT (5:32 p.m. EDT) on Atlas V 401 vehicle AV-020 from SLC-41.
EarthDeployment
LRO separates from LCROSS and the Centaur upper stage
NSSDCA states "LRO and LCROSS separated at 22:16:43 UT" following launch; LRO was then put on a direct insertion trajectory to the Moon.
EarthOrbit insertion
Lunar orbit insertion
After a roughly four-and-a-half-day journey from Earth, LRO fired its rocket motor on the far side of the Moon and entered an elliptical commissioning orbit, with initial parameters of roughly 30 x 216 km. Published times of day for the insertion differ between sources, so only the date is asserted.
MoonMilestone
LROC returns its first image of the Moon
The Lunar Reconnaissance Orbiter Camera returned its first image of the Moon, of an area near Mare Nubium, during instrument commissioning.
MoonMilestone
Primary one-year mapping mission begins from the 50 km science orbit
The four engine firings of 23-27 June 2009 left LRO in its elliptical commissioning orbit rather than the mapping orbit. A separate Mission Orbit Insertion burn on 15 September 2009 placed LRO in its roughly circular 50 km (31 mile) polar orbit and began the primary one-year mission to map the lunar surface.
MoonMilestone
Science mission begins; SMD takes over from ESMD
LRO completed its primary one-year mapping mission and began the phase officially designated the science mission, transferring programmatic control from NASA's Exploration Systems Mission Directorate to its Science Mission Directorate. The cited source states only the month, so no day is recorded.
MoonMilestone
Orbit lowered to a 20 x 165 km polar orbit with perilune near the south pole
Controllers at Goddard Space Flight Center sent commands to LRO to fire its engines twice to change its orbit, taking it closer to the Moon than before - a polar orbit of about 12 x 102 miles (20 x 165 kilometers), with perilune near the lunar south pole.
Moon
Mission architecture
Vehicles
Lunar Reconnaissance Orbiter · Orbiter · active
Destinations: Moon
Trajectory record
Time-dependent navigation trajectory
Source states place the model at the selected time. Reconstructed flight, estimates, predictions and historical mission plans are identified by interval; gaps remain visible.
Source records and sampling assumptions are retained with the repository data. Model attitude and surface appearance are illustrative.
- Lunar Reconnaissance Orbiter: Reconstructed · June 18, 2009 to June 15, 2026
Provenance
Sources
Each source is listed once and labeled with the mission, event, trajectory, or destination/body context it supports.
Data verified through August 23, 2026
- Lunar Reconnaissance Orbiter (LRO) - NSSDCA/COSPAR ID 2009-031A (archived 27 June 2025) — NSSDCAArchive · Supports: mission claims · event claims
- Lunar Reconnaissance Orbiter - About (NASA Science) — NASAMission page · Supports: mission claims · event claims
- 15 Years Ago: Lunar Reconnaissance Orbiter Begins Moon Mapping Mission — NASAMission page · Supports: mission claims · event claims
- Lunar Reconnaissance Orbiter (NASA Science mission page) — NASAMission page · Supports: mission claims
- NASA's LRO Images Falcon 9 Crater on Moon, Learns New Details — NASAMission page · Supports: mission claims
- Lunar Reconnaissance Orbiter - NASA GSFC Sciences and Exploration Directorate project page — NASAMission page · Supports: mission claims
- LRO definitive spacecraft, antenna and array orientation archive — NAIFArchive · Supports: mission claims
- LRO spacecraft and mechanism frame definitions — NAIFArchive · Supports: mission claims
- Craig Tooley: LRO Spacecraft and Objectives, 19 May 2006, dimensional layouts — NASATechnical document · Supports: mission claims
- Philip Calhoun: Solar Array Disturbances to Spacecraft Pointing during the LRO Mission — NASATechnical document · Supports: mission claims
- LSP Primary Launches Archive — NASAMission page · Supports: mission claims · event claims
- DE421 lunar mean-Earth and principal-axes frame specification — NAIFTechnical document · Supports: destination/body context
- DE440 lunar mean-Earth and principal-axes frame specification — NAIFSpice · Supports: destination/body context
- IAU rotational elements and body radii (PCK 00011) — NAIFSpice · Supports: destination/body context
- LOLA global lunar height maps, LDEM_4 V3 original PDS source label — NASATechnical document · Supports: destination/body context
- LOLA 2023 south-polar elevation, uncertainty and effective-resolution maps — NASATechnical document · Supports: destination/body context
- Blue Ghost Lunar Lander Seen From Above: LROC site and terrain context — NASATechnical document · Supports: destination/body context
- Moon Facts — NASAOther · Supports: destination/body context
- SLDEM2015 Blue Ghost region: original PDS elevation-grid label — NASATechnical document · Supports: destination/body context
- JPL Solar System Dynamics Astrodynamic Parameters — JPLOther · Supports: destination/body context
- Planet Sizes and Locations in Our Solar System — NASAOther · Supports: destination/body context