Mission Atlas
← Mission directory

Mission record

Luna 13

Also known as Lunik 13, Luna13

U.S.S.R · Launched

Explore trajectory

Completed · Success

The third spacecraft to make a successful soft-landing on the Moon, following Luna 9 and Surveyor 1; it landed in the region of Oceanus Procellarum and returned panoramas of the lunar landscape along with regolith density, penetrometer, temperature and radiation measurements.

Destinations
Launch vehicle
Modified SS-6 (Sapwood) with 2nd Generation Upper Stage + Escape Stage
Launch site
Tyuratam (Baikonur Cosmodrome), U.S.S.R
Countries
Soviet Union
Mission types
Lander

Chronology

Mission timeline

  1. Launch

    Luna 13 launched

    Earth
  2. Deployment

    Luna 13 landing capsule separated

  3. Landing

    Luna 13 soft-landed in the region of Oceanus Procellarum

    Moon
  4. Milestone

    Luna 13 transmitted panoramas of the nearby lunar landscape

    Moon
  5. Loss of contact

    Luna 13 made its last transmission session

    The current NSSDCA record places the final session between04:05 and06:13 UT. The earlier04:05 timestamp marked the start of that session; exact clock/receipt conversion remains unresolved.

    Moon

Mission architecture

Vehicles

  • Luna 13 · Spacecraft

    Destinations: Moon

    • Luna 13 landing capsule · Lander

      Destinations: Moon

Trajectory record

Time-dependent navigation trajectory

Source states place the model at the selected time. Reconstructed flight, estimates, predictions and historical mission plans are identified by interval; gaps remain visible.

Source records and sampling assumptions are retained with the repository data. Model attitude and surface appearance are illustrative.

  • Luna 13 landed capsule: Physically reconstructed based on publicly available data · approximate nominal site, post-landing only · December 25, 1966 to December 26, 1966

Provenance

Sources

Each source is listed once and labeled with the mission, event, trajectory, or destination/body context it supports.

Data verified through August 24, 2026